Nishat Chunian Limited – Unit 4
Industrial
Completed

Nishat Chunian Limited – Unit 4

Large-scale industrial RCC construction with complete HVAC ducting and AC plant installation

Manga-Raiwind Road, Lahore, Pakistan

2020

PROJECT OVERVIEW

Project facts

Large-scale industrial RCC construction with complete HVAC ducting and AC plant installation

Client

Nishat Chunian Limited

Area

75000 sq ft

Duration

Jan 2019 — Oct 2019

Floors

Ground

Technical Details

Project Specifications

Structure Type

Reinforced Cement Concrete (RCC) Frame Structure

Materials Used

Cement, brick, terrazzo, steel reinforcement, timber partitions, HVAC ducting materials, AC plant equipment

Foundation

Reinforced concrete foundation

Safety Standards

Complied with industrial safety standards and local building codes

Sustainability

Drainage system, proper ventilation, soling work, energy-efficient AC plant and ducting system

Certifications

Local Building Authority Approved

Project Specs

Signature Delivery
Highlights

Sustainability, safety, certifications, and materials, drawn directly from how this project was specified and built.

6

specs

Drainage system

proper ventilation

soling work

energy-efficient AC plant and ducting system

Complied with industrial safety standards and local building codes

Local Building Authority Approved

How We Overcame Constraints

Challenges & Solutions

On-site realities, engineered responses, and the approach that kept delivery on track.

Challenges faced

  • Large-scale industrial site coordination across multiple contract scopes
  • Integration of HVAC ducting (RA & SA) with RCC structural works
  • Maintaining production continuity during active construction phases
  • Completing full scope within a 10-month timeline

Solutions implemented

  • Dedicated site teams assigned per contract scope
  • Coordinated RCC and mechanical (HVAC) works through phased scheduling
  • Phased handover to avoid disruption to ongoing production
  • Strict timeline management with daily progress tracking

Unique approach

Delivered a complex industrial project combining RCC structural construction with full HVAC ducting and AC plant installation for Nishat Chunian Unit 4, completing all works within a disciplined 10-month schedule while maintaining uninterrupted factory operations.

Project visuals

Project Gallery

A curated look at key moments across every phase of construction. Click any image to open the full lightbox and browse the complete set.

Nishat Chunian Limited – Unit 4 — photo 1
Nishat Chunian Limited – Unit 4 — photo 2
Nishat Chunian Limited – Unit 4 — photo 3
Nishat Chunian Limited – Unit 4 — photo 4
Nishat Chunian Limited – Unit 4 — photo 5
Nishat Chunian Limited – Unit 4 — photo 6
Nishat Chunian Limited – Unit 4 — photo 7
Nishat Chunian Limited – Unit 4 — photo 8

+12

more